Leather Training Lead Pink By British By Design
Price:
£24.00
Stock: 1 in stock
Stock: 1 in stock
British By Design
Leather Training Lead
Colour: Pink - (picture of pink colour NOT shown on the image)
2cm wide x 190cm long
This product is produced in the North of Britain by a company that has over 50 years experience in the pet product industry.
They only source the best products to produce their collars, harnesses and leads.
These are made from strong, hard wearing leather and decorated with traditional designed furniture.
With metal trigger hook clips at each end so it is easy to attach to your dogs collar and 2 metal circles so the lead can be used at different lengths.
Great for training dogs, not wander off or to give more scope to roam.
Write Review
Your Name:
Your Review: Note: HTML is not translated!
Rating: Bad Good
Enter the code in the box below:
![](index.php?route=product/product/captcha)
Your Review: Note: HTML is not translated!
Rating: Bad Good
Enter the code in the box below:
There are no additional images for this product.