Dog & Co 6 In 1 Sports Training Lead Black 1" X 72" Hem & Boo
Price:
£15.99
Stock: 1 in stock
Stock: 1 in stock
Overview
6 in 1 sports training lead
Two ended trigger hooks on both ends.
Two metal D-rings and One metal circular ring to allow various lead lengths
Ideal for walks in the park or more serious dog training.
This lead can be used at a choice of three lengths: short - 93cm, medium - 115cm or long - 160cm.
The lead can also be used to walk two dogs, hands free and used as a tether at any of the 3 lengths.
Metal trigger hooks and rings in black.
Reflective for dadded safety
Colour
Black with Grey
Size
30 mm x 1.8 mtr
Write Review
Your Name:
Your Review: Note: HTML is not translated!
Rating: Bad Good
Enter the code in the box below:

Your Review: Note: HTML is not translated!
Rating: Bad Good
Enter the code in the box below:
There are no additional images for this product.